What started as a kitchen remodel transitioned into a whole-house project when the homeowners realized doing everything at once would be easier than going through a second renovation. The couple had just bought the four-story home in the Cathedral Heights neighborhood of Washington, D.C., and worked with Landis Architects|Builders to update it before they moved in. 

From the location of the HVAC system to a structural brick wall cutting through the kitchen and a basement apartment that was not to code, the firm reworked the 4,000 square feet of the 1932 home to make it suitable for a modern family.  

“We’re good at figuring out when homes have enough space, but it’s not utilized well,” said Ethan Landis, co-founder and CEO of the Washington, D.C.-based firm. “We are able to look at the space with fresh eyes.” 

Challenge #1: Making Two Kitchen Halves a Whole 

In the kitchen, which sits on the ground floor, Landis encountered two issues – a structural brick wall that divided the space in two and the results of a previous cost-driven renovation. To remove the barrier of the brick wall, the team designed a 22-foot steel beam that traversed the entire room and weighed at least 1,000 pounds. After removing the wall, the house was held up by a temporary structure so the beam could be installed. 

Get the latest kitchen and bath products, trends and news delivered to your inbox.

“We’ve put in a lot of steel beams, but this one was difficult,” said Landis. “We had to get it into the house and install it using only human power.”   

The demanding update resulted in a 440-square-foot eat-in kitchen and connected the space with the back deck, so it was well worth it. During an earlier renovation, the ventilation had been directed into the neighbor’s yard, so a new vent and ductwork were installed. Electrical and lighting were changed too, and all this had to happen before the more visually exciting updates could be made. 

Solutions Historic Washington, D.C. Home

Challenge #2: Second Floor Becoming More  

Upstairs, the second floor brought more spatial and mechanical problems, starting with an HVAC system set in the center of the space. Landis created a new layout for the entire level. The first important choice was to install two new HVAC systems and locate them in the basement and attic instead.  

Solutions Historic Washington, D.C. Home

With the freer footprint, the team created a sizeable primary suite with a 400-square-foot closet and a spacious bathroom, then brought the laundry up from the basement. The changes offered the chance to redo the plumbing, which had been laid out inefficiently – probably not by a professional.  

“Making sure systems work well is something people take for granted,” said the architect. “But in an older home, you need to have someone design it right.” 

While updating the second floor, the team was able to sister all joists with additional joists to make them stronger and run the new plumbing to meet building codes.  

Solutions Historic Washington, D.C. Home

Challenge #3: Basement Blues 

The story continued in the basement where a 1,500-square-foot rental unit was already occupied when the clients bought the home. Once again, the electrical work had not been professionally done, nor was the space properly permitted. Getting a Certificate of Occupancy required significant added work, which fixed hidden problems rather than adding visible value.  

All lighting and ductwork were replaced. The ceilings and walls had to be insulated, and fire walls installed to separate the rental space from the main home. The changes required the tenant to move out temporarily, which turned out to be longer than expected.  

Less-visible features like electrical, plumbing and HVAC systems might not be at the top of clients’ wish lists, but considering the whole home saves them from having to fix these issues later. Here, it also enabled the team to bring more function and flow to the home. One key to success was the use of 3D architectural software, including Autodesk Revit and Chief Architect.  

“Understanding all the spaces and systems impacted a number of decisions but allowed us to maximize livable square footage,” said Landis. “The clients were happy the house was done instead of mostly done.”  

Sources

Architect/Builder: Ethan Landis, Co-founder and CEO, Landis Architects|Builders Photographer: Matthew Dandy Photography KITCHEN Appliances: Samsung Backsplash: Tile Club Cabinet Paint: Benjamin Moore Cabinet Hardware: Top Knobs Cabinets: Bremtown Countertop: Milkado Surfaces Faucets: Brizo Lighting: Rejuvenation and Schoolhouse Sinks: Kraus PRIMARY BATH Accessories & Faucets: Delta Flooring: Kenridge Lighting: Alora Mirrors: Pottery Barn Shower Drain: Schluter Shower Backsplash & Tile: Bedrosians Shower Floor Tile: Nature Tumbled Paint: Benjamin Moore Vanity: Miseno HALL BATH Accessories & Faucet: Delta Flooring: DreamStone Lighting: Generation Lighting Mirror: Lamps Plus Paint: Benjamin Moore Shower Fixtures: Arvo Shower Tile: Parry Toilet & Tub: American Standard Vanity: Wayfair 

Upcoming Events

Strategy & Planning Series
Strategy & Planning Series
B2B Marketing Exchange
B2B Marketing Exchange East
Buyer Insights & Intelligence Series